Overview & Basic Info
Material Applied
Austenite, Ferrite, Duplex Stainless Steel
Product Parameters
| No. |
Name |
Q'ty |
Unit |
| 1 | Mandrel traction structure | 1 | set |
| 2 | Rolling trolley | 1 | set |
| 3 | Hydraulic drive station | 1 | set |
| 4 | Electric control system | 1 | set |
| 5 | Rollers | 1 | set |
| 6 | Mandrel | 1 | piece |
| 7 | Pull rod | 1 | piece |
Features
⚙️
Matching: Will be matched with industrial pipe making machine.
🔧
Component: Inside and outside weld seam leveling equipment, hydraulic air control system, automatic electric hydraulic air control system with PLC, hydraulic cycling equipment for mold and roll.
With four pillar structure, the rollers could press the tube bead more evenly and stable. This model is especially suitable for making precision industrial pipe, with high performance.
🛡️
Function: Stainless steel welded pipe welding leveling device and a built-in SKD11 mandrel. Through the control to achieve the strength and make stainless welded pipe and weld leveling, completely remove the internal and external welding.
Working Procedure
Application
After the internal weld is leveled, the stainless steel welded pipe has smooth inner and outer walls. Suitable for high-end applications such as sanitary fluid pipes, heat exchange pipes, oil and gas pipelines, etc.
Detailed Photos
Production & Partnerships
Packaging & Shipping
Frequently Asked Questions
1. Which countries are your products exported to?
Our products are sold all over the world and carry all related certifications for international markets.
2. What is the warranty policy for the machinery?
All products come with a one-year quality warranty. During this period, spare parts replacement is free. We also provide lifelong technical support.
3. How is the machine installation handled?
Engineers are usually sent to your facility to assist with installation and adjustment. We also provide detailed manuals and video instructions.
4. What are the typical payment terms and delivery times?
For large machinery, we typically require a 40% deposit and 60% before shipment. Delivery times generally range between 45-90 days depending on customization.
5. Do your products meet ISO or CE standards?
Yes, all our goods are ISO certified. We ensure all machines meet high-quality manufacturing standards.
6. Which export ports do you primarily use?
We can use any Chinese port. Commonly, we ship via Shenzhen port, but this can be appointed based on your preference.