| Customization: | Available |
|---|---|
| Robot Quantity: | 2 Robotic for Polishing, 1 for Transport |
| Capacity: | 800-1400PCS/Day |
| Model NO. | RPS |
| PLC | Siemens |
| Electric Elements | Schneider or Omron |
| Dedust | Pluse Dedust or Water Curtain |
| Glazing Method | by Robot |
| Robot Brand | Fanuc From Japan |
| Pneumatic Elements | SMC Brand |
| Carry Weight | 50kgs for Transport |
| HS Code | 8424899990 |
| Production Capacity | 800-1400PCS |
At present, most of these sanitary ceramic polishing processes use manual polishing, which has high physical harm to personnel, high labor intensity, and relatively large dust exposure. Operators are prone to occupational diseases, and product quality is heavily affected by human factors.







| Robot repairing green base polishing systems parameters | |
|---|---|
| Transfer Robot Body | FANUC, R-2000ic /210L |
| Rotation Radius | 2655mm |
| Carrying Weight | 210KG |
| Axis Quantity | 6 |
| Polishing Unit 1 | FANUC, M-710ic/50L |
| Constant Force Range | 5-150N |
| Displacement Sensor Accuracy | 0.01mm |
1. Handling Status: The R4 transport robot moves the pre-booked body from the transport line to the turntable.
2. Polishing State: The turntable rotates 90° per turn. Three stations perform simultaneous polishing once conditions are met.
3. Offline State: After 270° polishing is finished, the robot executes the blanking operation to move the finished piece off the line.
4. Pneumatic System: Controlled by SMC components to adjust pressure for grinding heads and cylinder movements.
| Working Time | 9 Hours per shift |
| Output | 800-1400 Piece/shift |



Sandstorm Steel